최신 IBM Certified Application Developer C9050-042 무료샘플문제:
1. An external subroutine procedure requires 10 variables belonging to an input file and 10 variables
belonging to an output file. What is best practice in passing these variables to the procedure?
A) Integrate the 10 variables belonging to the input file in one structure and the 10 variables belonging to
the output file in another one and pass the addresses of them as parameters to the procedure.
B) Integrate the 20 variables in one structure and pass the address of the structure in the parameter list.
C) Pass the 20 variables individually in the parameter list.
D) Declare the 20 variables EXTERNAL in both the calling program and in the procedure called and pass
no variable in the parameter list.
2. In a multithreading environment, when can a race condition occur between two threads?
A) When they periorm an operation on same memory area
B) When they operate synchronously
C) When they cause a deadlock
D) When the threads have the same priority
3. Assuming there is no information about the duration or each table update and the programs are running in
a multitasking environment, which of the following options will best minimize the chance for deadlocks?
A) Programs update table A, Table B and Table C in random order.
B) All programs update Table A, Table B and Table C in the same order.
C) Program A updates Table A, Table B and Table C in the specified order, and Program B updates Table
B, Table C and Table A in the specified order.
D) Program A updates Table A, Table B and Table C in the specified order, and Program B updates Table
C, Table B and Table A in the specified order.
4. What will be printed after the following statements?
DCL B BIT(5); B = 1; PUT(B);
A) '00001'B
B) '00010'B
C) '11111'B
D) '10000'B
5. Given the following declarations, which code is likely to perform best and correctly initialize structure 3?
DCL 1 S UNALIGNED, 2 A CHAR(3), 2 B BIN FIXED(31), 2 C DEC FIXED(5); DCL 1 T UNALIGNED
LIKE S; T = ";
A) S = ";
B) S = T,BY NAME;
C) CALL PLIFILL(ADDR(S),'',STG(S));
D) CALL PLIMOVE(ADDR(S),ADDR(T),STG(S));
질문과 대답:
| 질문 # 1 정답: A | 질문 # 2 정답: A | 질문 # 3 정답: B | 질문 # 4 정답: B | 질문 # 5 정답: D |














1215 개 고객 리뷰
품질과 가치ITCertKR 의 높은 정확도를 보장하는 최고품질의 덤프는 IT인증시험에 대비하여 제작된것으로서 높은 적중율을 자랑하고 있습니다.
테스트 및 승인ITCertKR 의 덤프는 모두 엘리트한 전문가들이 실제시험문제를 분석하여 답을 작성한 만큼 시험문제의 적중률은 아주 높습니다.
쉽게 시험패스ITCertKR의 테스트 엔진을 사용하여 시험을 준비한다는것은 첫 번째 시도에서 인증시험 패스성공을 의미합니다.
주문하기전 체험ITCertKR의 각 제품은 무료 데모를 제공합니다. 구입하기로 결정하기 전에 덤프샘플문제로 덤프품질과 실용성을 검증할수 있습니다.
