최신 CATE C4040-109 무료샘플문제:
1. An administrator has a Power 720 with 64GB of memory and Active Memory Expansion (AME).
An LPAR has only 10GB of memory available and an application has been sized at 15GB of memory. The administrator runs amepat to determine an efficient expansion factor. Based on the output, an expansion factor of 1.6 has been chosen.
How should this be configured in the LPAR?
A) Enter 16GB as 'desired', enter 1.6 in the Active memory expansion factor field.
B) Enter 16GB as 'desired' and modify/etc/ame.conf with AME_RATIO=1.6.
C) Enter 10GB as 'desired' and modify/etc/ame.conf with AME_RATIO=1.6.
D) Enter 10GB as 'desired', enter 1.6 in the Active memory expansion factor field.
2. An administrator is designing a new system for their existing batch environment. The current system is a POWER5 570 with 16 cores and 128GB of RAM with a single LPAR running AIX 5.3. It takes 12 hours to run their large batch job which is heavily CPU bound on 4 the available CPUs. The new system will be a Power 770 with 16 cores, 128GB of RAM and the LPAR will run AIX 6.1.What should be done to maximize the batch performance?
A) Activate TurboCore mode during batch processing
B) Set the processor compatibility mode to POWER7
C) Disable Simultaneous Multi-threading
D) Disable Multiple Shared Processor Pools
3. An administrator is attempting to configure a new deployment of 56 POWER7 Blades across 4 IBM BladeCenter H chassis. Each blade will be installed with an IVM and 2 LPARs.IVM is installed and the administrator checks that both LHEA ports are reporting a Link State of "Up." 2 LPARs are created and the network traffic balanced by allocating one LHEA port to the first LPAR, the second port to the other. After successfully installing the first LPAR via NIM, the administrator finds the second LPAR fails to netboot. What should the administrator verify on the BladeCenter Chassis?
A) That both the external LHEA ports have been cabled.
B) That the Multi-Core Scaling (MCS) attribute is correctly set on both LHEA ports.
C) That 4 power supplies (PSU) have been installed.
D) That a secondary I/O module has been installed and cabled.
4. A customer is planning to purchase a fully populated Power 795. There are 65 applications which need to run and all need an AIX 7 environment. The architect is considering whether to use an LPAR for each application or to use a single large LPAR and have a WPAR for each application.
What must be considered before creating the environment?
A) There is a limit of 64 WPARs in any AIX V7 global environment.
B) An activation key for LPARs with more than 128 processors is required.
C) Multiple IVE adapters are required to support all the partitions.
D) There is a limit of 32 Processors in a WPAR.
5. Certain configurations of Power 770 and Power 780 servers can be ordered with multiple IVE adapters. When designing a configuration to provide improved network availability what fact should be observed as a risk?
A) An EtherChannel device created from adjacent IVE ports can result in broadcast storms.
B) IVE adapters do not support hot-plug operations.
C) 1Gbps and 10Gbps adapters may not be aggregated into a single logical link.
D) The same model of IVE must be ordered for each building block.
질문과 대답:
| 질문 # 1 정답: D | 질문 # 2 정답: C | 질문 # 3 정답: D | 질문 # 4 정답: B | 질문 # 5 정답: B |














1088 개 고객 리뷰
품질과 가치ITCertKR 의 높은 정확도를 보장하는 최고품질의 덤프는 IT인증시험에 대비하여 제작된것으로서 높은 적중율을 자랑하고 있습니다.
테스트 및 승인ITCertKR 의 덤프는 모두 엘리트한 전문가들이 실제시험문제를 분석하여 답을 작성한 만큼 시험문제의 적중률은 아주 높습니다.
쉽게 시험패스ITCertKR의 테스트 엔진을 사용하여 시험을 준비한다는것은 첫 번째 시도에서 인증시험 패스성공을 의미합니다.
주문하기전 체험ITCertKR의 각 제품은 무료 데모를 제공합니다. 구입하기로 결정하기 전에 덤프샘플문제로 덤프품질과 실용성을 검증할수 있습니다.
