최신 API Certification API-1169 무료샘플문제:
1. All pipe installed off shore ,under water not more than 200 ft (60) meters deep but less than 12 ft must have ______ in cover of soil. ( except in the Gulf of Mexico and its inlets)
49 CFR 192.319
A) 8
B) 5
C) 36
D) 48
2. Facility, Commissioning, and Pre-start-up Review, inspectors should understand owner/operator MOT requirements and why adherence to them can prevent incidents. In the case of construction MOC concepts do what?
A) Recognize, document, and communicate such factors as change and personnel, organizational make up, physical configuration/layouts, equipment, site conditions, materials, and procedures if required.
B) Management with regard to quality, can include establishing quality policies in quality objectives and processes to achieve these quality objectives through quality planning quality assurance quality control and quality improvement(ISO 9000 3.3.4)
C) They shall be accepted as meeting the requirements provided they break at not less than 95% of the tensile strength of the material(API 1104 5.3)
D) Action to illuminate the cause of a potential nonconformity or other potential undesirable situation.(Preventative action is taken to prevent occurrence were as correct of action is taken to prevent recurrence)(ISO 9000 3.12.1)
3. Deficiencies, unsatisfactory work, thefts, vandalism,missing materials/property or suspicious activities are all ___________________ by inspector.
A) Benchmarking
B) Required reporting
C) Clearing
D) Quality improvement
4. Define Inspector
A) An individual qualified to monitor, assess, evaluate, verify, discuss, decide, resolve, report, and document pipeline construction activities to ensure the requirements of the design, drawings, specifications, regulations, and Industry practises are being met safely, effectively, and in an environmentally sound manner.
B) Action to illuminate the cause of a non-conformity in to prevent recurrence.(correct of action is taken to prevent recurrence where as preventative action is taken to prevent occurrence)(ISO 9000 3.12.2)
C) Is the area in which soil must be removed by non-mechanical means such as (hand digging, pot-holing, or hydro-Vac) rather than mechanical means. It is an area within 2 feet of the existing facilities or the distance mandated by state law where applicable, whichever is greater.
D) Confirmation, through the provisions of objective evidence, that the requirements for a specific intended use or application have been fulfilled.(The objective evidence needed for a validation is the result of a test or other form of determination such as performing alternative calculations or reviewing documents)(ISO 9000 3.8.13)
5. Define Owner
A) An individual qualified to monitor, assess, evaluate, verify, discuss, decide, resolve, report, and document pipeline construction activities to ensure the requirements of the design, drawings, specifications, regulations, and Industry practises are being met safely, effectively, and in an environmentally sound manner.
B) Is the singular point of contact identified within the company of the crossing company and the owner who has the responsibility to communicate about the safely managed crossing. There will be a cross and Company designated contact and an owner designated contact.
C) Is the entity that owns our operates the existing pipeline facilities. The owner may designate a third-party or parties to perform the tasks necessary to enable a safe crossing of its facilities by crossing company but remains responsible for the work performed by such third-party.
D) Is the vertical separation between the existing pipeline and facilities and where the new pipeline is being installed. The recommended crossing clearance distance between the new pipeline and the existing facilities is two feet (24"). The minimum distance is one foot (12"). The new pipeline should be installed at a level depth across the ROW, if practicable.
질문과 대답:
| 질문 # 1 정답: C | 질문 # 2 정답: D | 질문 # 3 정답: A | 질문 # 4 정답: A | 질문 # 5 정답: C |














1419 개 고객 리뷰
품질과 가치ITCertKR 의 높은 정확도를 보장하는 최고품질의 덤프는 IT인증시험에 대비하여 제작된것으로서 높은 적중율을 자랑하고 있습니다.
테스트 및 승인ITCertKR 의 덤프는 모두 엘리트한 전문가들이 실제시험문제를 분석하여 답을 작성한 만큼 시험문제의 적중률은 아주 높습니다.
쉽게 시험패스ITCertKR의 테스트 엔진을 사용하여 시험을 준비한다는것은 첫 번째 시도에서 인증시험 패스성공을 의미합니다.
주문하기전 체험ITCertKR의 각 제품은 무료 데모를 제공합니다. 구입하기로 결정하기 전에 덤프샘플문제로 덤프품질과 실용성을 검증할수 있습니다.