최신 Oracle Applications 1z1-244 무료샘플문제:
1. Identify three correct statements that depict the advantages of the Holistic planning approach.
A) The Holistic planning approach requires least planning effort leading to the generation of fewer plans.
B) The Holistic planning approach does not have the capability of Global Optimization.
C) The Holistic planning approach Is not supported in Release 12.
D) Data consistency is the benefit when using multiple Organization plans.
E) Holistic plans are not recommended for large scale modeling of supply chains. These types of plans are intended to be used In a single Organization Implementation.
F) The Holistic planning approach is recommended for large scale Implementations Involving a large supply chain.
2. Identify the correct statement about setting lead time information In the Sublnventory Definition form.
A) The ASCP planning engine uses Preprocessing and Postprocessing lead times only from the Sublnventory Definition form.
B) The ASCP Planning engine does not use the lead times defined in the Sublnventory Definition form.
This Is only for the Min-Max Planning process.
C) The ASCP planning engine uses the sublnventory lead time Information only for an Intra-Organization transfer purpose.
D) The lead times defined in the Subinventory Definition form is used only during a Constrained Optimized plan with penalty factors and decision rules.
E) The ASCP planning engine uses the subinventory lead time information only for transfers across Organizations.
F) The precedence for lead time Is Items (First priority), Supplier (Second priority), and Subinventory (Third priority).
3. A constrained plan with the Enforce Capacity Constraints option is run and you are asked to analyze Late Demands in the plan.
Which two exception messages are critical In the above case?
A) Sourcing Split Percentage violated
B) Order is firmed late
C) Late Replenishment for Sales Order
D) Late Replenishment for Forecast
E) Demand quantity not satisfied
4. The following are attributes for an ASCP data store:
1. This Is one of the data stores used In ASCP between launches of the planning engine to collect data.
2. To perform action, this specific type requires data to be moved from the transaction data store to this data store.
3. This specific type requires you, as a planner, to be aware of the timing Issues involved in data collection.
4. This specific type could be said to refer to systems that instruct what the transaction systems need to do to meet demand.
Identify this ASCP data store.
A) Planning data store
B) Time and Materials data store
C) Supply data store
D) Transaction data store
5. Identify five Decision Rules that can be enabled through ASCP Plan Options.
A) Use Substitute Instances.
B) Use Alternate Resources.
C) Use End Item Substitution.
D) Use Alternate Sources.
E) Use Alternate BOM/Routing.
F) Use Substitute Components.
G) Use Alternate Allocation Rules.
H) Use Alternate Ship Method.
질문과 대답:
| 질문 # 1 정답: A,D,F | 질문 # 2 정답: C | 질문 # 3 정답: C,E | 질문 # 4 정답: B | 질문 # 5 정답: B,C,D,E,F |














971 개 고객 리뷰
품질과 가치ITCertKR 의 높은 정확도를 보장하는 최고품질의 덤프는 IT인증시험에 대비하여 제작된것으로서 높은 적중율을 자랑하고 있습니다.
테스트 및 승인ITCertKR 의 덤프는 모두 엘리트한 전문가들이 실제시험문제를 분석하여 답을 작성한 만큼 시험문제의 적중률은 아주 높습니다.
쉽게 시험패스ITCertKR의 테스트 엔진을 사용하여 시험을 준비한다는것은 첫 번째 시도에서 인증시험 패스성공을 의미합니다.
주문하기전 체험ITCertKR의 각 제품은 무료 데모를 제공합니다. 구입하기로 결정하기 전에 덤프샘플문제로 덤프품질과 실용성을 검증할수 있습니다.